REFINA - Site Visit
Site Visit Platform: Legacy Modernization, API Hardening & Mobile Integration
Lead Backend Engineer · PT Sarana Multi Infrastruktur (Persero)
Owned the full modernization of the Site Visit platform — a two-part enterprise system consisting of a Laravel web application and a companion REST API that serves collateral site-inspection workflows across web and mobile clients. Took both services from an untested, end-of-life Laravel 7-era baseline to Laravel 13 on PHP 8.5, introduced an automated end-to-end quality gate that must pass before any production deployment, and closed a set of long-standing defects that had blocked reliable mobile use.
Key deliverables and achievements:
• Modernized two interdependent Laravel services from Laravel 9 through consecutive major upgrades to 13.38 on PHP 8.5, re-baselining configuration, storage layout, and frontend assets (Vue 2.7) so the applications could run on a fully supported stack without a rewrite.
• Introduced a CI-safe test foundation where none existed: isolated test databases per connection, a smoke-test suite for the upgrade path, and regression coverage expanded to the API's media and facility endpoints.
• Built an automated Playwright end-to-end gate spanning the web application and the REST API, achieving 36 of 36 web scenarios passing on the development server — then made that suite a mandatory precondition for production release.
• Diagnosed and resolved defects that had silently broken core flows: an LDAP parsing fault that returned 500 errors on user edit, server-side API calls missing the /api/v1 prefix, and detail pages returning 500 instead of a correct 404 for missing or invalid records.
• Hardened the API surface ahead of mobile rollout by restoring request throttling, tightening validation of media upload payloads, and enforcing encryption and certificate verification on the SQL Server connection.
• Validated the Flutter mobile client against the upgraded API contract, confirming 54 of 55 endpoints compatible and isolating the single pre-existing gap, so the mobile release could be scoped on evidence rather than guesswork.
• Delivered a native IIS deployment path including build arguments for a PHP 8.5 / Node 24 image, per-environment credential handling for end-to-end tests, and a documented deployment and rollback procedure.
• Authored the consolidated upgrade and testing dossier, plus a mandatory pre-deployment protocol requiring an audit of the actual commit being shipped and a green end-to-end run — converting deployment from an act of judgement into a verifiable checklist.
• Acted as the technical interface between business users, QA, and infrastructure, translating inspection-workflow requirements into a prioritized backlog and driving batches of fixes to closure with UAT sign-off.